Roads and logistics

CorridorWatch

Tunnels, slopes and fleets, kept moving through the mountains.

Deformation monitoring during tunnel and road construction, early warning of debris flows, avalanches and rockfall along the route, and automated analysis of the telematics data you already collect.

Operational question

“Is the pass open for tonight’s convoy?”

Constraints we address

  • Tunnels and cuttings deform during construction.
  • Debris flows, avalanches and rockfall close routes and halt convoys.
  • Weather on mountain passes changes faster than schedules.
  • Fuel theft and idling erode the fleet budget.
  • Perishable cargo degrades at borders and in transit.

Operator view

CorridorWatch: simulationNormal
  • Tunnel convergence

    Ring 214 · Normal

    8.5mm

  • Snow depth on the pass

    Station P-1 · Normal

    64cm

  • Fuel alarms today

    Fleet · Normal

    1

  • Reefer temperature

    Trailer 07 · Normal

    3.8°C

Simulated data. Illustrates the IEC 60073 alarm states.

Instrumentation

Modular by design.

01

Construction monitoring

Tunnel convergence, deformation of cuttings and embankments, and blast vibration.

Tunnel convergence · Settlement · Slope displacement · Piezometer · Blast vibration (PPV) · InSAR displacement map

02

Route hazards

Critical sections monitored for debris flow, avalanche and rockfall, with meteorology on the passes.

Debris-flow sensor · Snow depth · Rockfall barrier sensor · Time-lapse camera · Weather station

03

Fleet telematics

Integrates with existing trackers such as Wialon or Teltonika. No hardware replacement.

Vehicle trackers · Fuel level sensor · Engine data (CAN)

04

Cargo condition

Temperature, humidity and shock for export cargo; dwell time at borders.

Temperature logger · Humidity · Shock · GPS

CorridorWatch delivery

Four stages. Each one stands alone.

Every stage delivers a defined output. You decide whether to proceed.

Assess

Site inspection or satellite screening. Hazard register, instrumentation plan and budget.

Commercial terms

Fixed price, 2–6 weeks. Credited against the next stage.

  • Route hazard assessment from satellite archives and event records
  • Monitoring plan for tunnels, cuttings and critical sections
  • Review of existing telematics data

Technical specifications.

CorridorWatch · Roads and logistics

Measured parameters
Tunnel convergence, Settlement, Slope displacement, Piezometer, Blast vibration (PPV), InSAR displacement map, Debris-flow sensor, Snow depth, Rockfall barrier sensor, Time-lapse camera, Weather station, Vehicle trackers, Fuel level sensor, Engine data (CAN), Temperature logger, Humidity, Shock, GPS
Telemetry
LoRaWAN, cellular or satellite, selected at site survey
Power
Solar or battery. No mains required at the measurement point
Reporting interval
5–15 min
Alarm delivery
Voice call, SMS, Telegram, email. Recipients and escalation set per site
Forecasting
  • Short-term hazard forecasts for convoy and works planning
  • Automated fuel theft detection
  • Maintenance reminders from engine hours and mileage
Service
  • Alarm monitoring during construction and in winter
  • Field maintenance on remote sections
  • Weekly monitoring reports
Outcomes
  • Construction risks found while they are still inexpensive to fix
  • Fewer unplanned closures; safer convoy timing
  • Fuel losses detected and stopped
  • Documented cargo condition for buyers
Applications
  • Road, rail and tunnel contractors
  • Logistics and trucking companies
  • Mining haulage operators
  • Terminals and dry ports

Start with a satellite screening of your site.

2–4 weeks. No equipment on site. The result shows where ground instrumentation is justified.