01
Upstream gauging
Stage and discharge at stations placed for hours of warning, not minutes.
Radar water level · Tipping-bucket rain gauge · Snow depth · Air temperature
Hydropower
Inflow forecast. Sediment control. Upstream hazard warning.
Upstream gauging stations, satellite snow and glacier data, and hydrological models give operators a 1–10 day inflow forecast. Debris-flow and sediment alarms arrive with hours of lead time, not minutes.
Operational question
Operator view
Water level, upstream
Gauge U-2 · Normal
1.42m
Turbidity at intake
Intake · Normal
410NTU
Inflow forecast, 24 h
Model · Normal
18.6m³/s
Headpond level
Headpond · Normal
3.10m
Simulated data. Illustrates the IEC 60073 alarm states.
Instrumentation
01
Stage and discharge at stations placed for hours of warning, not minutes.
Radar water level · Tipping-bucket rain gauge · Snow depth · Air temperature
02
Continuous turbidity, debris load and headpond level.
Turbidity (NTU) · Headpond level · Trash-rack camera
03
Debris-flow channels, unstable slopes and glacial lakes, monitored in situ and from orbit.
Debris-flow sensor · Slope displacement · Time-lapse camera · Satellite imagery of glacial lakes
04
Read-only connection to plant SCADA. Forecast and output on one screen; control logic untouched.
SCADA (read-only) · Gate position · Active power
HydroSight delivery
Every stage delivers a defined output. You decide whether to proceed.
Site inspection or satellite screening. Hazard register, instrumentation plan and budget.
Commercial terms
Fixed price, 2–6 weeks. Credited against the next stage.
Small Plant configuration for 0.5–5 MW: fewer stations and a lower monthly fee.
HydroSight · Hydropower
2–4 weeks. No equipment on site. The result shows where ground instrumentation is justified.